{"id":374,"date":"2019-04-15T10:45:09","date_gmt":"2019-04-15T10:45:09","guid":{"rendered":"http:\/\/thepaphospost.com\/?p=374"},"modified":"2019-04-01T08:59:52","modified_gmt":"2019-04-01T08:59:52","slug":"repairs-due-at-dangerous-chlorakas-bridge","status":"publish","type":"post","link":"https:\/\/thepaphospost.com\/index.php\/2019\/04\/15\/repairs-due-at-dangerous-chlorakas-bridge\/","title":{"rendered":"Repairs Due at Dangerous Chlorakas Bridge"},"content":{"rendered":"\n<p>By Bejay Browne<\/p>\n\n\n\n<p>Residents living close to a dangerous bridge in Paphos will be relieved to learn that a new structure will be built very soon, after serious concerns were raised that a serious accident could occur.<\/p>\n\n\n\n<p>The mayor of Paphos, Phedonas Phedonos, told the Paphos Post that the municipal council had decided to back a tender which will see a new protective wall being built and the current road moved to the left.<\/p>\n\n\n\n<p>The bridge is built over a river bed, which is dry for most of the year, and forms part of a narrow road that leads from Moutallos in Paphos to Chlorakas. It is often busy and used by all sorts of vehicles including, lorries, buses and coaches.<\/p>\n\n\n\n<p>Often, during heavy rain, the road is covered in deep, fast running water, making it impassable.<\/p>\n\n\n\n<p>Residents have been appealing to the authorities for some time, to take urgent action to strengthen and widen the road before a serious accident occurs.<\/p>\n\n\n\n<p>During the winter and periods of rain, torrents of water wash over the road making it impossible to see the edges and a number of cars have already driven off the edge, having to be rescued and towed away.<\/p>\n\n\n\n<p>Three huge boulders have also recently washed down the hillside in a cascade of water, and now sit in the river bed, posing another threat to any vehicle veering off the road and driving straight into them.<\/p>\n\n\n\n<p>\u201cLuckily, no serious accidents have occurred at the spot as yet,\u201d said Andreas Evlavis, secretary of the Paphos Green party.<\/p>\n\n\n\n<p>\u201cWe are all concerned that an accident could result in serious injury or even death,\u201d he said.<\/p>\n\n\n\n<p>Following a barrage of complaints from residents, Evlavis said that the Greens wrote numerous letters of complaint to local authorities, resulting in action being taken only by Paphos municipality.<\/p>\n\n\n\n<p>Evlavis said that the only official to respond was Phedonos.<\/p>\n\n\n\n<p>\u201cThe situation is getting worse on a daily basis and an accident here would be catastrophic,\u201d he said.<\/p>\n\n\n\n<p>Phedonos said the tender process for the project got underway two months ago with seven companies bidding for the job. The offers were then evaluated.<\/p>\n\n\n\n<p>The project will cost 142,000 euros and once a bank guarantee is produced by the winning company (one of the criteria of the tender) the contract will be signed, said the mayor.<\/p>\n\n\n\n<p>\u201cThis should take place next week and then work will get underway immediately. It will take at least two months to complete,\u201d he said.<\/p>\n\n\n\n<p>Evlavis added that the narrow road is extremely busy, used by many who use it as a cut through to Paphos old town.<\/p>\n\n\n\n<p>Recently Paphos municipal technicians took some temporary measures in the area filling in holes with soil (most of which has already washed away), and a number of bollards were also put in place.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Bejay Browne Residents living close to a dangerous bridge in Paphos will be relieved to learn that a new structure will be built very&#8230;<\/p>\n","protected":false},"author":2,"featured_media":375,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7],"tags":[191,23,190,94,170,11,86,158,9],"class_list":["post-374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local-news","tag-chlorakas","tag-cyprus","tag-dangerous-bridge","tag-living-in-paphos","tag-news-in-cyprus","tag-paphos","tag-paphos-local-news","tag-paphos-newspaper","tag-paphos-post","entry","double"],"jetpack_featured_media_url":"https:\/\/thepaphospost.com\/wp-content\/uploads\/2019\/04\/bridge-2-Flooded-Chlorakas-road-before-it-became-impassable-photo-Bejay-Browne-770x523.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/posts\/374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/comments?post=374"}],"version-history":[{"count":1,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/posts\/374\/revisions"}],"predecessor-version":[{"id":376,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/posts\/374\/revisions\/376"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/media\/375"}],"wp:attachment":[{"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/media?parent=374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/categories?post=374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thepaphospost.com\/index.php\/wp-json\/wp\/v2\/tags?post=374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}